Project Description
Fit-out of a 50.000 m² logistics building, for LIDL, with a deep-frozen storage area of 9.000m² (-24°C) and a very-cold storage / preparation area of 2.300m² (1°C).
Our Input
Full MEP Fit-Out design including energy harvesting studies, fire protection (spinklers) for utilities of the site (plenum air conditioning and sprinkler protection inside cold chambers). Generator of 2.500kVA to secure the cold production designed by the industrial which provide deep-frozen water and specific temperatures for mechanical systems. Loading bays air conditioning …
Integration of a large photovoltaic production on the roof (1 MWc) and design of the energy harvesting on cold production.
Key Features
High volume and plenum treatment between chambers and construction to maintain confort and temperature with efficiency
FIRST Q MEMBER(S)
Barbanel
Services
- Building services design
Project Size
50.000 m²
Date
2026
Website