Project Description
Bakery Factory
Our input
Complete design of all electromechanical interior installation (HVAC, Plumbing and Firefighting Systems, Low Voltage and Extra Low Voltage)
Key Features
Over half of the facility consisted of –40°C refrigeration storage, while the Romanian Fire Department mandated a smoke‑extraction system that could operate regardless of internal temperature. This created significant engineering challenges. In summer conditions, with external temperatures around +37°C, the smoke‑exhaust ducts required large cross‑sections to ensure rapid smoke removal. Ensuring airtightness and preventing warm‑air infiltration into the deep‑freeze areas through these ducts was particularly difficult
FIRST Q MEMBER(S)
MC General Construct Engineering
Services
Mechanical and Electrical Services Design
Project Size
15.500 m2
Date
2021