Project Description
RETROFITTING OF HIGH-POWER ENERGY PUMPING STATIONS
The designed structure falls under Category "A" in accordance with NP 130/1999..
Our Input
Mechanical and Electrical Services Design
Key Features
The Jidoaia dam and hydroelectric scheme serve primarily to collect and consolidate water from the secondary collection networks in the Lotru Mountains. These water flows are subsequently pumped via the associated station directly into the Vidra reservoir.
FIRST Q MEMBER(S)
MC GENERAL CONSTRUCT ENGINEERING
Services
Mechanical and Electrical Services Design
PROJECT Size
50 m height, 0.3 million m³ usable volume
DATE
2026 - present
LOCATION
Voineasa, Romania
WEBSITE
Share
:format(webp)?_w=1920)