Project Description
The grounds where the hospital is built extend to 20 hectares. The new health care facility contains a hospital, a rehabilitation centre, a care hotel, an outpatients’ clinic, lecture halls, public events spaces and a helipad. The challenges and ambitions of the new hospital range from being highly functional and future-oriented to sustainable and, as well, to conserve the rural character of the environment.
Our Input
A clear choice has been made to use sustainable and energy saving measures without compromising on the high comfort requirements. Among other things, a biomass boiler, cogeneration and borehole energy storage contribute to sustainable energy generation.
Ingenium was responsible for the study of the complete technical equipment of the building, and also for the commissioning in the new hospital. For this, in-depth tests are carried out that exceed those of a normal delivery. Special attention is also paid to the operation and interaction of the installations, technical and structural, after commissioning, and to the maintenance contracts of the different technical installations.
Key FeaturesWe used our expertise and know-how in the hospital sector to provide the client with intensive guidance. That way, optimum decisions regarding comfort, budget and desired functionality were made.
First Q Member(s)
Ingenium
Services
- Energy, utilities and infrastructure planning
Project Size
53.000 m²
Date
2007 - 2018
Location
Knokke, Belgium
Website
Share
:format(webp)?_w=1920)