Project description
The new Bridge Hospital, located in the Meilahti hospital area of the hospital district of Helsinki and Uusimaa, was completed in June 2022 and is the largest construction project in the history of HUS. Launched in 2017, the approximately EUR 300 million project was implemented as a collaborative project management contract, enabling simultaneous planning and construction – and a tight schedule.
In 2020, the Bridge Hospital received recognition at the international Tekla Global BIM Awards as the best public sector project.
Our Input
The consulting group Granlund-Ramboll was responsible for the design of the building services (HPAC, electricity and automation), fixed medical equipment and energy consulting for the Bridge Hospital.
Key Features
The hospital features strict MEP design standards, including advanced air quality, temperature, and humidity control, with specialized operating rooms and intensive care stations. Notably energy-efficient, the hospital incorporates heat recovery and energy recycling.
BIM played a key role in the complex project of the Bridge Hospital, aiding in the coordination of intricate technical systems and automation. BIM's contribution extended to enhancing the flexibility of the hospital's premises, ensuring scalability and accommodating future expansion and construction needs.
First Q Member(s)
Granlund
SERVICES
- Building services design
- Energy, utilities and infrastructure planning
- Specialist consultancy: lighting, fire, vertical transport
PROJECT SIZE
71,500 square metres
Date
Completed 2022
Location
Finland
Website
Share
:format(webp)?_w=1920)
:format(webp)?_w=1920)
:format(webp)?_w=1920)